The Hardest Decision of the Year: Why We Shut Down UrbanFlow

This article sums up the fifth episode of Jurnal de Fondator (Founder’s Journal), a weekly video series in Romanian where Bobo, founder of Cmevo Digital, talks about the real decisions behind building software products. Watch the episode on YouTube.
Episode five is about the hardest decision of the past year: shutting down UrbanFlow, a project that ran for two to three months, before it could be fully validated. Bobo explains what happened, what went wrong, and what he’s taking with him.
What UrbanFlow was
UrbanFlow was a platform that made it easier to manage urban planning and construction permits. It:
- generated pre-filled official applications, the forms you fill in when you submit a permit request to the city hall or ask an institution for an approval;
- tracked validity deadlines for building permits and the required approvals;
- centralized every project in one place, from the first urban planning certificate to the final acceptance of the works.
It was built for permit consultants, architects, general contractors and legal or permitting consultancies, not for end customers who want to build a house or another type of building.
The problem it tried to solve
Every construction project needs a long chain of approvals: an urban planning certificate, utility approvals, building and operating permits, and many others. Each one comes with:
- its own form, often filled in by hand, repeating the same details every time: the beneficiary’s name, land identification data, the purpose of the construction and so on;
- its own institution where it has to be submitted;
- its own validity period. Some expire, some don’t, and the ones that do must be renewed in time if the works aren’t finished.
Consultants usually keep all this in Excel or on paper. With several projects running in parallel, it gets hard: 10 sites with 10 approvals each means 100 deadlines to track. A regular calendar like Google Calendar can do it, but it wasn’t built for this.
Missing a deadline is serious. The site has to be stopped until the approval is renewed, which can take several weeks and means extra costs everywhere.
The idea behind UrbanFlow: put all that paperwork in one place, enter the project details once, and reuse them in every form, adding only the extra details each institution asks for.
How the project was set up
The team wanted to validate the idea quickly with an MVP, get a few real users, test it and understand their needs. There seemed to be a real problem and nothing on the market solved it; competitors were only tangential, offering site management, not permitting.
Building went fast. With AI agents, existing infrastructure and a base codebase reused for new projects, the team had an MVP fairly quickly.
UrbanFlow started as a 50-50 partnership between Cmevo Digital and an experienced partner from the industry:
- Cmevo Digital handled the technical side and operational customer support when needed;
- the partner, as the domain expert, handled everything customer-facing: conversations, prospecting, analysis and consulting.
It was a gentleman’s agreement, and on paper it worked well. In practice, both sides soon realized they didn’t have enough time to dedicate to a new project.
What went wrong
1. The MVP kept growing. The goal was to validate one idea: you need all your data in one place, you want to generate many forms easily from there, and you want email alerts before deadlines expire. Instead, the team kept adding small features, because they got caught up in the project and it felt cool.
What Bobo would do differently: set one hypothesis to validate from the start, and only after consistent customer feedback decide whether to pivot, add features, extend the MVP or build the real product.
2. Lack of time. This was the real problem. The partner couldn’t get as involved as he would have liked, and the most important early part was missing: talking to potential customers, bringing them to the table, testing together, validating ideas and iterating.
Without it, nobody was talking to customers. People were testing the app, but no one was following up. There was a product, but the learning had stopped, and with it any understanding of who the market was.
The decision
The decision came fairly quickly, in about two to three weeks of trying to agree on a direction without being able to. The team weighed the time already invested and the opportunity cost, but the lack of a shared rhythm settled it.
“We didn’t close because the market said no, because we don’t know that answer yet. We closed because we no longer had the conditions to find out.”
Lessons
- Validation is the second half of the product. If nobody collects customer feedback, you don’t have a product, you have a project. A product sells something in exchange for something, so each side gets something. A project takes your time without paying you back.
- Co-founders have to move at the same pace, in the same direction. Agree early on how much time each person can commit. Not discussing it more at the start was everyone’s mistake.
- Write the MVP down. The team got carried away by conversations and kept going on a few shaky ideas, without ever clearly defining what to build first.
- Have a stopping point for the MVP. There wasn’t one.
- Be ready to compromise. On this front, things went well; both sides made the compromises needed.
- Set criteria for starting, continuing or iterating, and stopping, so it’s easier for everyone to know when to move to the next stage, whatever it is.
- Closing fast is cheaper than a slow death. Time spent on a stuck project, even just thinking about it, never comes back. For Bobo, stopping the server and deciding “that’s it” freed up mental space for something else.
Not time wasted
You keep what a project gives you: lessons, a codebase, an architecture. You take it with you and you’ll certainly use it again. For Bobo, trying to build something is never wasted time.
What’s next
The team will focus on new ideas, but with broader, clearer and more detailed validation from the start, with initial terms that can change as new information comes in.
Bobo thought these lessons were already learned. They weren’t, and maybe that was the point of the project. Despite all the talk about an MVP, UrbanFlow had largely become a finished product, one that could have been sold with lots of extras that could have been cut. Next time, the idea gets validated much better before most of the product is built.
Have you ever shut down a project? What was your story, and what did you learn? Tell us in the comments of the YouTube video.
Întrebări frecvente
Why was UrbanFlow shut down?
Not because the market said no; that answer never came. It was closed because the conditions to find the answer were gone: nobody had enough time to talk to customers and follow up with the people testing the app, so the team stopped learning.
What was UrbanFlow?
A platform for managing urban planning and construction permits. It generated pre-filled official application forms, tracked the validity of permits and approvals, and kept every project in one place, from the urban planning certificate to final acceptance of the works.
What is the difference between a product and a project?
A product sells something in exchange for something, so each side gets something out of it. A project takes your time without paying you back. Without customer feedback, you only have a project.
What would the team do differently next time?
Define a written MVP with a clear hypothesis and a stopping point, agree from the start how much time each co-founder can commit, set criteria for starting, continuing, iterating and stopping, and validate the idea much more thoroughly before building most of the product.